How to correctly determine the volume of remotional work in the apartment

Starting repair work in the apartment, first of all, it is necessary to decide on their volume. You need to clearly imagine the desired final result for yourself. Provided that the repairs in the room will include a redevelopment, which, as a rule, is associated with a change in the proportions of the space inside the apartment, then it is necessary to collect a package of documents with appropriate permits. This procedure can take a lot of time. This must be taken into account.

The next step can be called the creation of a phased work plan and drawing up an apartment plan with the necessary technical marks on it. In the case when the overhaul in the house was carried out for a very long time or was not carried out at all, it would be most correct to immediately replace the communications of heating and water supply. Now this case can be entrusted without any problems. But, first of all, you should get the consent of the neighbors to turn off the water supply due to work on replacing pipes, albeit for a while. As a rule, major repairs need to replace or redistribute the wiring in the apartment. It is worth considering this stage in the process of demolition of the walls and the creation of new structures.

The room needs to be released and de -energized. All electric wires should be taken to one place, for example, in the hallway. So it will be possible to control the operation of the energy system. Overlapping the risers of the water supply, it should be sure that the heating system does not have water. If the demolition of the walls was planned, then it is carried out precisely at this stage.

It is necessary to dismantle and replace with new pipes and risers of hot and cold heating, as well as heating systems. After that, you can start repair work in the bathroom – laying tiles and installation of the ceiling.

The same can be done in other rooms. The process will also include the laying of new wiring and other electrical work.

In the event that you want to replace windows and window sills, then this operation needs to be done before the finishing work starts.

The flooring of the floor in all rooms is the final stage!

We hope that you will be able to do everything quickly and competently!